Crossover Boulevard Road
Portfolios
Winchester, VA
Project Description
Construction of one mile of new paved roads with 321 lf bridge over I-81 and 2 lane roundabout. The project involves coordination of utilities, maintenance of traffic at both I-81 bridge crossing and Rt. 522 tie in. Project includes import of over 300,000 tons of select material type 1 and installation of 9,000 lf storm sewer piping. Also includes water line, concrete curbing and asphalt pavement. Project ties into the Tevis Street project that Perry completed in 2018 for the City of Winchester.
Reference
Frederick County Dept. of Public Works
Snowden Bridge Boulevard Extension
Portfolios
Stephenson, VA
Project Description
Construction of approximately 1 mile of paved road with a bridge that is 126 feet in length. The bridge crosses CSX railroad line. Includes coordination of major utilities (ie overhead power lines, jack/bore water line under railroad). Grading of approximately 75,000 cy including rock removal and sinkhole remediation. Utility work consists of 3,300 lf of storm sewer and 5,500 lf of water main. Curbing and asphalt trail follow the roadway.
Reference
Frederick County Department of Public Works
Trex Building 6
Portfolios
Winchester, VA
Graystone Industrial Center – Phase 1
Graystone Building 3
Portfolios
Winchester, VA
Project Description
210,000 sf warehouse building in same complex we did buildings 1 and 2 for same client. Project includes large storm sewer bypass line to divert run off water thru site. Project includes 4,400 lf of storm sewer. Typical warehouse construction including sanitary, water, concrete paving and asphalt paving.
Reference
Howard Shockey
Hope Drive Expansion
Portfolios
Winchester, VA
Project Description
Construction of Hope Drive between Valley Avenue and Pleasant Valley Road. Includes new asphalt road, site concrete, storm, sanitary and water lines, new traffic signal, street lighting, landscaping, tunneling under railroad. Work to be done while maintaining traffic flow in the area.
Reference
City of Winchester
Hackwoods – Phase 1
Portfolios
Winchester, VA
Project Description
Sitework for 10 retirement villas on a 21-acre site. Done in 2 phases. Work includes site grading, underground utilities – storm, sanitary and water, site concrete, asphalt paving and restoration. Site is very rocky and will include extensive mass blasting and hoe ramming to obtain grades.
Reference
Warfel Construction