CAFO Phase C Pond Construction

Portfolios

Charles Town, WV

Project Description

Excavation of pond and remove 30,000 cy offsite. Installation of pond liner and storm piping into and out of new pond.

Reference

PNGI Charles Town Gaming, LLC

VDOT K41 – Rt. 11 at Cedar Creek Battlefield

Portfolios

Strasburg, VA

Project Description

Realignment of existing Rt. 11 including new bridge construction, demo of two bridges, grading and new pavement while maintaining safe travel for those using the roadway.

Reference

VDOT

VDOT A23 Intersection Reconstruction – Sulfur Springs Road

Portfolios

Winchester, VA

Project Description

Reconstruction of ex. road, approx. 1.2 miles, widening and raising the grade of the road while maintaining safe travel for those using the roadway. Includes replacing the ex. box culvert with a new arch culvert including shoring to stabilize roadway. Import of 54,000 cy of shale fill to build up roadway.

Reference

VDOT

Museum of the Shenandoah Valley Trails

Portfolios

Winchester, VA

Project Description

Construction of approximately 10,000 lf of 8′ wide asphalt trail. Project also includes 2 ea pedestrian bridges and a floating walkway thru the wetlands. Trail winds thru the perimeter property of the museum. This project is part of the Green Trail system.

Reference

City of Winchester

Frederick Water Ballfields

Portfolios

Stephenson, VA

Project Description

Construction of five softball fields including grading, storm, sanitary, water utilities, infield mix, fencing and parking.

Reference

Frederick Water

Raven Oaks Subdivision

Portfolios

Winchester, VA

Project Description

Subdivision for 143 homes with over 100,000 cy of dirt/topsoil to move, 7,500 lf of storm sewer, 9,000 lf of sanitary main and laterals, and 6,100 lf of water line. also includes curb and asphalt paving.

Reference

Richmond American Homes

Crossover Boulevard Road

Portfolios

Winchester, VA

Project Description

Construction of one mile of new paved roads with 321 lf bridge over I-81 and 2 lane roundabout. The project involves coordination of utilities, maintenance of traffic at both I-81 bridge crossing and Rt. 522 tie in. Project includes import of over 300,000 tons of select material type 1 and installation of 9,000 lf storm sewer piping. Also includes water line, concrete curbing and asphalt pavement. Project ties into the Tevis Street project that Perry completed in 2018 for the City of Winchester.

Reference

Frederick County Dept. of Public Works

Snowden Bridge Boulevard Extension

Portfolios

Stephenson, VA

Project Description

Construction of approximately 1 mile of paved road with a bridge that is 126 feet in length. The bridge crosses CSX railroad line. Includes coordination of major utilities (ie overhead power lines, jack/bore water line under railroad). Grading of approximately 75,000 cy including rock removal and sinkhole remediation. Utility work consists of 3,300 lf of storm sewer and 5,500 lf of water main. Curbing and asphalt trail follow the roadway.

Reference

Frederick County Department of Public Works

Trex Building 6

Portfolios

Winchester, VA

Project Description

Sitework for new 181,000 sf building. Project consists of removing rock along shored walls for partial underground building, underground utilities including conduit system for relocating existing overhead power lines, site concrete and asphalt paving.

Reference

Howard Shockey

Graystone Industrial Center – Phase 1

Portfolios

Winchester, VA

Project Description

Grading of 40 acres for industrial park storm water pond and 240,000 sf of building. Very rocky site. Work also includes underground utilities, site concrete, asphalt and concrete paving.

Reference

Howard Shockey