CAFO Phase C Pond Construction

Current

Charles Town, WV

Project Description

Excavation of pond and remove 30,000 cy offsite. Installation of pond liner and storm piping into and out of new pond.

Reference

PNGI Charles Town Gaming, LLC

Trex Building 6

Current

Winchester, VA

Project Description

Sitework for new 181,000 sf building. Project consists of removing rock along shored walls for partial underground building, underground utilities including conduit system for relocating existing overhead power lines, site concrete and asphalt paving.

Reference

Howard Shockey

Hope Drive Expansion

Current

Winchester, VA

Project Description

Construction of Hope Drive between Valley Avenue and Pleasant Valley Road. Includes new asphalt road, site concrete, storm, sanitary and water lines, new traffic signal, street lighting, landscaping, tunneling under railroad. Work to be done while maintaining traffic flow in the area.

Reference

City of Winchester

Hackwoods – Phase 1

Current

Winchester, VA

Project Description

Sitework for 5 retirement villas on a 15-acre site. This is phase 1 of 2 phases. Work includes site grading, underground utilities – storm, sanitary and water, site concrete, asphalt paving and restoration. Site is very rocky and will include extensive mass blasting and hoe ramming to obtain grades.

Reference

Warfel Construction

One Logistics Park Mass Grading PI Plan

Current

Winchester, VA

Project Description

Sitework of 124 acre site for Phase 1 industrial park – over 1,000,000 cy excavation. Work also includes 10,000 lf of storm sewer, 2,000 lf of sanitary sewer, 6,000 lf of water line, underdrain system, 4 ponds with liners, site concrete, asphalt roadways and restoration.

Reference

One Logistics Park, LP
c/o The Meridian Group