VDOT A23 Intersection Reconstruction – Sulfur Springs Road
Completed
Winchester, VA
Project Description
Reconstruction of ex. road, approx. 1.2 miles, widening and raising the grade of the road while maintaining safe travel for those using the roadway. Includes replacing the ex. box culvert with a new arch culvert including shoring to stabilize roadway. Import of 54,000 cy of shale fill to build up roadway.
Reference
VDOT
Museum of the Shenandoah Valley Trails
Completed
Winchester, VA
Project Description
Construction of approximately 10,000 lf of 8′ wide asphalt trail. Project also includes 2 ea pedestrian bridges and a floating walkway thru the wetlands. Trail winds thru the perimeter property of the museum. This project is part of the Green Trail system.
Reference
City of Winchester
Frederick Water Ballfields
Raven Oaks Subdivision
Crossover Boulevard Road
Completed
Winchester, VA
Project Description
Construction of one mile of new paved roads with 321 lf bridge over I-81 and 2 lane roundabout. The project involves coordination of utilities, maintenance of traffic at both I-81 bridge crossing and Rt. 522 tie in. Project includes import of over 300,000 tons of select material type 1 and installation of 9,000 lf storm sewer piping. Also includes water line, concrete curbing and asphalt pavement. Project ties into the Tevis Street project that Perry completed in 2018 for the City of Winchester.
Reference
Frederick County Dept. of Public Works
Snowden Bridge Boulevard Extension
Completed
Stephenson, VA
Project Description
Construction of approximately 1 mile of paved road with a bridge that is 126 feet in length. The bridge crosses CSX railroad line. Includes coordination of major utilities (ie overhead power lines, jack/bore water line under railroad). Grading of approximately 75,000 cy including rock removal and sinkhole remediation. Utility work consists of 3,300 lf of storm sewer and 5,500 lf of water main. Curbing and asphalt trail follow the roadway.
Reference
Frederick County Department of Public Works
Graystone Industrial Center – Phase 1
Graystone Building 3
Completed
Winchester, VA
Project Description
210,000 sf warehouse building in same complex we did buildings 1 and 2 for same client. Project includes large storm sewer bypass line to divert run off water thru site. Project includes 4,400 lf of storm sewer. Typical warehouse construction including sanitary, water, concrete paving and asphalt paving.
Reference
Howard Shockey