NAVY FEDERAL PH 2 TRAILS – Winchester, VA

Project Description: Construction of 3,200 lf of 6′ wide paved trails with 1,200 lf of retaining walls.  Work meanders thru woods and across streams. We are limited to 20 ft easement for construction.

WMC – CANCER CENTER PARKING LOT ADDITION – Winchester, VA

Project Description:  Construction of parking lot addition in existing swell.  Work consists of installing double run of 400 lf of 60” HDPE to reroute storm water.  Parking lot installed over piping.

MUSEUM OF THE SHENANDOAH VALLEY TRAILS PH 2 – Winchester, VA

 Project Description: Sitework for new entrance road to Museum of the Shenandoah.  Work includes permeable paver parking lot, large underground stormwater collection system, grading, storm, sanitary and water utilities, and asphalt paving.

NAVY FEDERAL BUILDING #3 – Winchester, VA

Project Description:  Sitework for building.  Project is located between new parking garage and adjacent building.  Work consists of working around shoring at adjacent building which is located at second floor elevation of new building.  Rock removal in close proximity to buildings and existing utilities.  Relocation of ex. utilities and working around pedestrian traffic.  Also includes […]

WMC – WEST CAMPUS SWM AND ROAD CONSTRUCTION – Winchester, VA

Project Description:  Construction of West Campus Boulevard and associated utilities and stormwater management facilities between the Rt 37 interchange and Botanical Boulevard.  Consists of mass grading, storm sewer, sanitary sewer, water main, dry utility conduits, site concrete and asphalt paving.

Navy Federal Parking Garage – Winchester, VA

 Project Description:  Sitework for parking garage.  Project consists of hauling over 100,000 cy of excess material offsite, underground utilities, Rain Tanks for underground storage, bioretention systems, site concrete and asphalt paving. 

Shenandoah University Athletics & Events Center – Winchester, VA

Project Description:  Sitework for 80,000 sf athletic building including undercut and backfill of existing fill area within building pad, grading, rock removal, underground utilities, bioretention basins, site concrete and paving.  Project received an ENR award for the Best Athletic Facility in the mid-Atlantic United States. Start Date:  September, 2016    Completion:  December, 2017 Contract Amount:  between $2,000,000 and $2,500,000 Engineer:   Greenway Engineering Reference: […]

SHENANDOAH COUNTY HORSE TRACK EXPANSION – WOODSTOCK, VA

Project Description:  Sitework for constructing stone dust horse racing track includes grading of 35,000 cy to achieve new grades. 

Department of Public Works Facility – Strasburg, VA

Project Description:  Sitework for maintenance buildings and yard.  Work includes grading, storm, sanitary, water, site concrete, and placement of stone for paving.   Existing site is very rock  – removed by blasting and hoe ramming.

JMU Mason Street Parking Deck

Project Description:  Sitework for 1,000 car parking garage for James Madison University use.  Work includes demolition of existing parking lot, complex foundation work – excavation, rock removal, lean concrete, backfilling of precast wall once in place, exterior utilities, site concrete and asphalt paving.  Work to be done in confined area surrounded by existing streets and […]