H P HOOD WAREHOUSE – WINCHESTER, VA

Project Description:  Sitework for 260,000 sf building.  Includes relocation of existing 20″ water main, bioretention features, working along existing stream, rock removal, grading, site utilities, site concrete, asphalt paving and restoration.

Miller Milling/K&J Investments Rail Development Project

Project Description:  Earthwork, drainage, and erosion control for siding tracks and rail yard; placement of subballast and ballast stone; construction of two retaining walls, and restoration.  Rock removal adjacement to functioning railroad line.

Highway Motors Expansion, Winchester, VA

Project Description:  28,000 sf building expansion.  Project includes demolition of existing utilities and pavement, installation of new utilities, underground stormwater storage facility, import of 15,000 cy of fill, concrete and asphalt paving.

U S Silica – Mapleton Phase 3 Overburden Removal – Mapleton, PA

Project Description:  Removal of 316,000 cy of overburden within quarry. 

White Wave Facility Expansion, Mt. Crawford, VA

Project Description:  143,000 sf building expansion.  Project is phased to maintain operation of existing facility.  Consists of 190,000 cy excavation,  approximately 10,000 lf of utility work (storm, sanitary and water), concrete and asphalt paving, and concrete retaining wall.

Home Depot RDC Truck Expansion – Winchester, VA

Project Description:  Expansion for 241 trailer spaces at existing Home Depot Distribution Center.  Includes importing structural fill, storm sewer, site concrete and asphalt paving.

Rubbermaid Expansion – Winchester, VA

Project Description:  Sitework for building expansion including storm sewer, water relocation, concrete paving, and asphalt paving.  Also included Redi-Rock retaining wall placed along property line in close working conditions.

Miller-Coors Finish Godds Warehouse Expansion – Rockingham County, VA

Project Description:  Site preparation, utility relocation, roadways…

Johnson Development Building 1, 2, 3, & 4 – Winchester, VA

Project Description:  New VDOT roadway construction; Extensive sitework with storm sewer, sanitary sewer, water main, site concrete, asphalt, and pavement markings

Apple Valley Industrial Park -Winchester, VA

Project Description:  Grading, drainage, utilities, and paving