COVIA OVERBURDEN STRIPPING 2019 – Gore, VA

Project Description: Removal of 250,000 cy of overburden material at the Gore quarry.  All operators have MSHA required training.

Equus Stonewall Building 3 – Winchester, VA

 Project Description:  Furnish and install stone base for 135,000 sy of roads and parking lots.  Our contract includes asphalt, curbing and pavement markings/signage for the site.  This is a very aggressive schedule for Amazon warehouse.

Amazon – Whitehall Commerce Center – Stephenson, VA

 Project Description:  Furnish and install stone base for 135,000 sy of roads and parking lots.  Our contract includes asphalt, curbing and pavement markings/signage for the site.  This is a very aggressive schedule for Amazon warehouse.

JAMES RIVER EQUIPMENT – STEPHENSON, VA

 Project Description:  Sitework for new building and 4.5 acres of gravel storage yard.  Project consists of grading including importing fill from offsite, rock removal, storm sewer, bioretention ponds and permeable gravel reservoirs, sanitary sewer, water, concrete paving and asphalt paving.

SOUTHEASTERN FREIGHTLINES – MT. CRAWFORD, VA

Project Description:  Sitework for new building pad surrounded by asphalt and concrete truck parking area.  Our contract consists of the grading including reworking ex. fill that was dumped onsite, rock removal, storm sewer, bioretention dry swale, sanitary sewer, water, concrete paving and asphalt paving. 

Graystone South – Trex 2 – Winchester, VA

Project Description:  Sitework for 407,000 sf building including relocation of approximately 46,000 cy of existing material, cut/fill of 60,000 cy, underground utilities, bioretention systems, site concrete and paving.  Aggressive construction schedule.  Job is adjacent to First Energy overhead power lines.

Graystone-Trex- Winchester, VA

Project Description:  Sitework for 350,000 sf building including removal of 40,000 cy of existing fill, cut/fill of 80,000 cy, underground utilities, bioretention systems, permeable pavers, site concrete and paving.  Project to be completed by November, 2015.  Very aggressive construction schedule.

FRAZIER QUARRY OVERBURDEN REMOVAL – HARRISONBURG, VA

Project Description:  Drill, blast, and remove 72,000 cy of overburden at quarry.

FED EX EXPANSION – WINCHESTER, VA

Project Description:  Sitework for 48,000 sf building addition including importing structural fill for new building pad, working around operating facitility, relocation of existing utilities, rock removal, and site paving.  

H P HOOD WAREHOUSE – WINCHESTER, VA

Project Description:  Sitework for 260,000 sf building.  Includes relocation of existing 20″ water main, bioretention features, working along existing stream, rock removal, grading, site utilities, site concrete, asphalt paving and restoration.