Major Projects Completed

COVIA OVERBURDEN STRIPPING 2019 – Gore, VA

Project Description: Removal of 250,000 cy of overburden material at the Gore quarry.  All operators have MSHA required training.

VDOT A85 INTERSECTION IMPROVEMENT, INDEPENDENCE DRIVE – Winchester, VA

Project Description: Reconstruction of ex. intersection to add Constitution Drive.  Addition of signalization and turn lanes to accommodate new Central Records Complex and NFCU building additions which will increase employee traffic flow.  Main road (Rt. 50) is heavily traveled road and much of this work will need to be done at night.

NAVY FEDERAL PH 2 TRAILS – Winchester, VA

Project Description: Construction of 3,200 lf of 6′ wide paved trails with 1,200 lf of retaining walls.  Work meanders thru woods and across streams. We are limited to 20 ft easement for construction.

LIFETIME HOLDINGS FACILITY – Winchester, VA

Project Description:  Sitework for 27,200 sf building includes grading, storm sewer, water, sanitary and asphalt paving.

WMC – CANCER CENTER PARKING LOT ADDITION – Winchester, VA

Project Description:  Construction of parking lot addition in existing swell.  Work consists of installing double run of 400 lf of 60” HDPE to reroute storm water.  Parking lot installed over piping.

MUSEUM OF THE SHENANDOAH VALLEY TRAILS PH 2 – Winchester, VA

 Project Description: Sitework for new entrance road to Museum of the Shenandoah.  Work includes permeable paver parking lot, large underground stormwater collection system, grading, storm, sanitary and water utilities, and asphalt paving.

NAVY FEDERAL BUILDING #3 – Winchester, VA

Project Description:  Sitework for building.  Project is located between new parking garage and adjacent building.  Work consists of working around shoring at adjacent building which is located at second floor elevation of new building.  Rock removal in close proximity to buildings and existing utilities.  Relocation of ex. utilities and working around pedestrian traffic.  Also includes […]

WMC – WEST CAMPUS SWM AND ROAD CONSTRUCTION – Winchester, VA

Project Description:  Construction of West Campus Boulevard and associated utilities and stormwater management facilities between the Rt 37 interchange and Botanical Boulevard.  Consists of mass grading, storm sewer, sanitary sewer, water main, dry utility conduits, site concrete and asphalt paving.

Equus Stonewall Building 3 – Winchester, VA

 Project Description:  Furnish and install stone base for 135,000 sy of roads and parking lots.  Our contract includes asphalt, curbing and pavement markings/signage for the site.  This is a very aggressive schedule for Amazon warehouse.

Constitution Drive – Winchester, VA

Project Description:  Road construction for access to Central Records Center.  Work to be done to VDOT standards – includes improvements to Rt 50 thru turn lanes and storm sewer improvements.