CROSSOVER BOULEVARD ROAD PROJECT – Winchester, VA

Project Description: Construction of one mile of new paved roads with 321 lf bridge over I-81 and 2 lane roundabout.  The project involves coordination of utilities, maintenance of traffic at both I-81 bridge crossing and Rt. 522 tie in.   Project includes import of over 300,000 tons of select material type 1 and installation of 9,000 […]

VDOT A85 INTERSECTION IMPROVEMENT, INDEPENDENCE DRIVE – Winchester, VA

Project Description: Reconstruction of ex. intersection to add Constitution Drive.  Addition of signalization and turn lanes to accommodate new Central Records Complex and NFCU building additions which will increase employee traffic flow.  Main road (Rt. 50) is heavily traveled road and much of this work will need to be done at night.

VDOT A23 INTERSECTION RECONSTRUCTION, SULFUR SPRINGS RD – Winchester, VA

Project Description: Reconstruction of ex. road, approx. 1.2 miles, widening and raising the grade of the road while maintaining safe travel for those using the roadway.  Includes replacing the ex. box culvert with a new arch culvert including shoring to stabilize roadway.  Import of 54,000 cy of shale fill to build up roadway.

Constitution Drive – Winchester, VA

Project Description:  Road construction for access to FBI Central Records Center.  Work to be done to VDOT standards – includes improvements to Rt 50 thru turn lanes and storm sewer improvements.