Current Projects

CAFO Consent Pump Station Ph B.1 – Charles Town, WV

Project Description: Excavation for new pump station.  Pit is 35 feet deep and will include extensive shoring due to location near horse practice track and maintenance building.

Hope Drive Expansion – Winchester, VA

Project Description: Construction of Hope Drive between Valley Avenue and Pleasant Valley Road.  Includes new asphalt road, site concrete, storm, sanitary and water lines, new traffic signal, street lighting, landscaping, tunneling under railroad.  Work to be done while maintaining traffic flow in the area.  

Raven Oaks Subdivision – Winchester, VA

Project Description:  Subdivision for 143 homes with over 100,000 cy of dirt/topsoil to move, 7,500 lf of storm sewer, 9,000 lf of sanitary main and laterals, and 6,100 lf of water line.  also includes curb and asphalt paving.

Trex Fleet Maintenance – Winchester, VA

Project Description:  Site development for parking lot for Trex Company, Inc.  Work consists of clearing, grading, storm sewer piping and water management basin, asphalt paving, concrete scale foundation, outdoor lighting and conduit for lighting, IT and security; fencing, gates and landscaping. .

Tractor Supply – Winchester, VA

Project Description:  Site development for 19,000 sf building.  Includes removal of  all existing sanitary and water services that were installed on project.  Grading, storm, sanitary and water with asphalt paving.

MELNOR WAREHOUSE – Winchester, VA

Project Description:  Grading for 160,000 sf warehouse including partially buried building. Work also includes underground utilities, site concrete and asphalt paving.

SHIHADEH INNOVATION CENTER – Winchester, VA

Project Description:  Improvements to existing elementary school building to convert to a training facility for local students.  Work consists of small additions around the building, repairing the parking lot and installing new walkways and minor utilities.

MUSEUM OF THE SHENANDOAH VALLEY TRAILS – WINCHESTER, VA

Project Description:  Construction of approximately 10,000 lf of 8′ wide asphalt trail.  Project also includes 2 ea pedestrian bridges and a floaring walkway thru the wetlands.  Trail winds thru the perimeter property of the museum.  This project is part of the Green Trail system.  

TREX BUILDING 6 – WINCHESTER, VA

Project Description:  Sitework for new 181,000 sf building.  Project consists of removing rock along shored walls for partial underground building, underground utilities including conduit system for relocating existing overhead power lines, site concrete and asphalt paving.  

CROSSOVER BOULEVARD ROAD PROJECT – Winchester, VA

Project Description: Construction of one mile of new paved roads with 321 lf bridge over I-81 and 2 lane roundabout.  The project involves coordination of utilities, maintenance of traffic at both I-81 bridge crossing and Rt. 522 tie in.   Project includes import of over 300,000 tons of select material type 1 and installation of 9,000 […]