Skip to content

VDOT A23 Intersection Reconstruction – Sulfur Springs Road

Winchester, VA

Project Description

Reconstruction of ex. road, approx. 1.2 miles, widening and raising the grade of the road while maintaining safe travel for those using the roadway. Includes replacing the ex. box culvert with a new arch culvert including shoring to stabilize roadway. Import of 54,000 cy of shale fill to build up roadway.

Reference

VDOT