VDOT A23 INTERSECTION RECONSTRUCTION, SULFUR SPRINGS RD – Winchester, VA

Project Description: Reconstruction of ex. road, approx. 1.2 miles, widening and raising the grade of the road while maintaining safe travel for those using the roadway.  Includes replacing the ex. box culvert with a new arch culvert including shoring to stabilize roadway.  Import of 54,000 cy of shale fill to build up roadway.

Start Date:  March, 2019

Scheduled Completion:  July, 2020

Percent Complete:        25%

Contract Amount:   $5,332,969

Engineer:  VDOT   

Reference:

VDOT
551 Mechanic Street
Luray, VA  22835
Contact: Jeff Somers
(540) 820-5146