Project Description: Construction of approximately 1 mile of paved road with a bridge that is 126 feet in length. The bridge crosses CSX railroad line. Includes coordination of major utilities (ie overhead power lines, jack/bore water line under railroad). Grading of approximately 75,000 cy including rock removal and sinkhole remediation. Utility work consists of 3,300 lf of storm sewer and 5,500 lf of water main. Curbing and asphalt trail follow the roadway.
Time Frame: February – December, 2016
Contract Amount: $7,099,000
Engineer: Stowe Engineering, PLC
Reference:
Frederick County Department of Public Works
107 North Kent Street
Winchester, VA 22601
Phone: 540-722-8215
Contact: Joe Wilder