Current Projects

VDOT A23 INTERSECTION RECONSTRUCTION, SULFUR SPRINGS RD – Winchester, VA

Project Description: Reconstruction of ex. road, approx. 1.2 miles, widening and raising the grade of the road while maintaining safe travel for those using the roadway.  Includes replacing the ex. box culvert with a new arch culvert including shoring to stabilize roadway.  Import of 54,000 cy of shale fill to build up roadway.

CB VENTURES – Winchester, VA

 Project Description: Sitework for retail, restaurant and hotel.  Project consists of grading both onsite and within VDOT I-81 ROW.  Site utilities with offsite force main and gravity sewer, storm, and water.  Contract also includes site concrete, asphalt paving, and return topsoil and permanent seeding.

HIATT RUN – STEPHENSON, VA

Project Description:  Sitework for 8 ea new apartment buildings – includes pump station, force main both onsite and offsite, storm sewer, water, gravity sanitary sewer, permeable pavers, asphalt parking, asphalt trail and site concrete.   Site lays low and requires hauling in 10,000 cy of offsite borrow. 

SACRED HEART GYM ADDITION – WINCHESTER, VA

Project Description:  Sitework for gym addition – involves relocating existing roadway, grading in small area onsite to achieve new building pad, and relocation of utilities. 

Shenandoah University Aspirational Village – Winchester, VA

Project Description:  Sitework for 2 ea buildings for student housing with associated parking.  Work includes grading, storm, sanitary, water, dry utilities, sidewalk, and paving.