SHENANDOAH COUNTY HORSE TRACK EXPANSION – WOODSTOCK, VA

Project Description:  Sitework for constructing stone dust horse racing track includes grading of 35,000 cy to achieve new grades. 

SACRED HEART GYM ADDITION – WINCHESTER, VA

Project Description:  Sitework for gym addition – involves relocating existing roadway, grading in small area onsite to achieve new building pad, and relocation of utilities. 

Snowden Bridge Boulevard Extension – Stephenson, VA

Project Description:  Construction of approximately 1 mile of paved road with a bridge that is 126 feet in length.  The bridge crosses CSX railroad line.  Includes coordination of major utilities (ie overhead power lines, jack/bore water line under railroad).   Grading of approximately 75,000 cy including rock removal and sinkhole remediation.  Utility work consists of 3,300 […]

Department of Public Works Facility – Strasburg, VA

Project Description:  Sitework for maintenance buildings and yard.  Work includes grading, storm, sanitary, water, site concrete, and placement of stone for paving.   Existing site is very rock  – removed by blasting and hoe ramming.

Shenandoah University Aspirational Village – Winchester, VA

Project Description:  Sitework for 2 ea buildings for student housing with associated parking.  Work includes grading, storm, sanitary, water, dry utilities, sidewalk, and paving. 

PLEASANT VALLEY ROAD – COMMERCIAL PROJECT – WINCHESTER, VA

Project Description:  Sitework for small commercial property.  Consists of grading, storm sewer, sanitary, water, site concrete and asphalt paving.

Graystone South – Trex 2 – Winchester, VA

Project Description:  Sitework for 407,000 sf building including relocation of approximately 46,000 cy of existing material, cut/fill of 60,000 cy, underground utilities, bioretention systems, site concrete and paving.  Aggressive construction schedule.  Job is adjacent to First Energy overhead power lines.

WMC – WEST CAMPUS RT 37 INTERCHANGE IMPROVEMENTS – Winchester, VA

Project Description:  Sitework for improvements to Rt. 37 interchange.  On Rt 522 we are adding another turn lane; Southbound ramp has a total reconstruction including roundabout and access to WMC property on west side of Rt. 37; Northbound ramp is being adjusted to meet the improvements to Southbound and give additional options once on ramp.  […]

JMU Mason Street Parking Deck

Project Description:  Sitework for 1,000 car parking garage for James Madison University use.  Work includes demolition of existing parking lot, complex foundation work – excavation, rock removal, lean concrete, backfilling of precast wall once in place, exterior utilities, site concrete and asphalt paving.  Work to be done in confined area surrounded by existing streets and […]

Graystone-Trex- Winchester, VA

Project Description:  Sitework for 350,000 sf building including removal of 40,000 cy of existing fill, cut/fill of 80,000 cy, underground utilities, bioretention systems, permeable pavers, site concrete and paving.  Project to be completed by November, 2015.  Very aggressive construction schedule.