Lake Frederick Phase 1, Section 2A, Frederick County, VA

Project Description:  Sitework for 21 lots in subdivision.  Work consist of grading for basements, including rock free pads, site utilities, curbing, conduit crossing and road pavement.

THE VILLAGE AT ORCHARD RIDGE PHASE 2 – WINCHESTER, VA

Project Description:  Sitework for several buildings and connector road.  Consists of grading, rock free building pads, backfill basement with geofoam blocks, site utilities, site concrete, and asphalt paving. Very rocky site requiring removal while working near ex. buildings and ex. utilities .

Westminster Cantebury Addition, Winchester, VA

Project Description:  The project consists of several building additions to the existing facility.  We will encounter utility relocations, some in very tight spaces.  We will install a sanitary line in the courtyard which will mean going under the second level pedestrian crosswalk.  Considerable rock removal will be involved which will need to be hoe rammed.  […]

THE VILLAGE AT ORCHARD RIDGE PHASE 1B – WINCHESTER, VA

Project Description:  Sitework for cottages and roadway.  Consists of grading, rock free pads, utilities, site concrete, and paving.  .

Village at Orchard Ridge – Winchester, VA

Project Description:  Sitework for new retirement village including 4,000 lf of boulevard construction to new site, grading of 50 acre site,  site concrete and paving.  Also includes large storm water pond with geosynthetic clay liner.  Approximately 5 miles of underground utilites – storm, sanitary and water. 

Meadows Edge Phase 2 & 2A – Stephens City, VA

Project Description:   Complete site work for a 62 lot housing development including grading, site utilities and paving.

Meadows Edge Phase 3 & 3A – Stephens City, VA

Project Description:   Complete site work for a 69 lot housing development including grading, site utilities and paving.

Fredericksburg Spring Arbor, Phase 2 – Fredericksburg, VA

Project Description:  Finish grading, storm sewer, bio-filtration system, sanitary and water for retirement building within property line.

Harvest Ridge – Winchester, VA

Project Description:  Construction of subdivision roads, lot grading, site utilities, site concrete and paving.

Lakeland Place – Phase 1 – Ranson, WVA

Project Description:  Complete site work for a 127 unit housing development, including four lane divided highway construction and detention basin, and box culvert installation with site utilities and conduit installation.