Major Projects Completed

WINCHESTER MARKETPLACE – PHASE 1 SITEWORK

Project Description:  Construction of a commercial site.  Includes import of 20,000 cy of structural fill for site grading.  Work consists of storm sewer, sanitary sewer including relocation and removal of existing 12″ and 15″ lines, and water line installation.  Several Filterra structures will be used for water quality.  Site concrete and paving will complete the […]

Frederick Co. Landfill Leachate Lagoon & Drainage Improvements – Winchester, VA

Project Description:  Roadway construction and widening throughout landfill, reconstruction of the leachate lagoon, construction of a leachate pumping system, and construction of stormwater and landfill cap drainage improvements.

Millwood Avenue Improvements – Phase 1 – Winchester, VA

Project Description:  Construction of a right-turn lane on ex. road, reconfiguration of an intersection, modification to several business entrances, installation of new traffic signal at reconfigured intersection, installation of new stormwater infrastructure including a BMP facility and site restoration.  This work will be performed  on a major road thru Winchester so traffic control will be […]

H P HOOD WAREHOUSE – WINCHESTER, VA

Project Description:  Sitework for 260,000 sf building.  Includes relocation of existing 20″ water main, bioretention features, working along existing stream, rock removal, grading, site utilities, site concrete, asphalt paving and restoration.

THE VILLAGE AT ORCHARD RIDGE PHASE 1B – WINCHESTER, VA

Project Description:  Sitework for cottages and roadway.  Consists of grading, rock free pads, utilities, site concrete, and paving.  .

Miller Milling/K&J Investments Rail Development Project

Project Description:  Earthwork, drainage, and erosion control for siding tracks and rail yard; placement of subballast and ballast stone; construction of two retaining walls, and restoration.  Rock removal adjacement to functioning railroad line.

Highway Motors Expansion, Winchester, VA

Project Description:  28,000 sf building expansion.  Project includes demolition of existing utilities and pavement, installation of new utilities, underground stormwater storage facility, import of 15,000 cy of fill, concrete and asphalt paving.

U S Silica – Mapleton Phase 3 Overburden Removal – Mapleton, PA

Project Description:  Removal of 316,000 cy of overburden within quarry. 

White Wave Facility Expansion, Mt. Crawford, VA

Project Description:  143,000 sf building expansion.  Project is phased to maintain operation of existing facility.  Consists of 190,000 cy excavation,  approximately 10,000 lf of utility work (storm, sanitary and water), concrete and asphalt paving, and concrete retaining wall.

Gainesboro Convenience Center – Frederick County, VA

Project Description:  Construction of landfill collection area including grading, gabion retaining walls, stone and asphalt paving.