SOUTHEASTERN FREIGHTLINES – MT. CRAWFORD, VA

Project Description:  Sitework for new building pad surrounded by asphalt and concrete truck parking area.  Our contract consists of the grading including reworking ex. fill that was dumped onsite, rock removal, storm sewer, bioretention dry swale, sanitary sewer, water, concrete paving and asphalt paving. 

Graystone South – Trex 2 – Winchester, VA

Project Description:  Sitework for 407,000 sf building including relocation of approximately 46,000 cy of existing material, cut/fill of 60,000 cy, underground utilities, bioretention systems, site concrete and paving.  Aggressive construction schedule.  Job is adjacent to First Energy overhead power lines.

Graystone-Trex- Winchester, VA

Project Description:  Sitework for 350,000 sf building including removal of 40,000 cy of existing fill, cut/fill of 80,000 cy, underground utilities, bioretention systems, permeable pavers, site concrete and paving.  Project to be completed by November, 2015.  Very aggressive construction schedule.

FRAZIER QUARRY OVERBURDEN REMOVAL – HARRISONBURG, VA

Project Description:  Drill, blast, and remove 72,000 cy of overburden at quarry.

FED EX EXPANSION – WINCHESTER, VA

Project Description:  Sitework for 48,000 sf building addition including importing structural fill for new building pad, working around operating facitility, relocation of existing utilities, rock removal, and site paving.  

H P HOOD WAREHOUSE – WINCHESTER, VA

Project Description:  Sitework for 260,000 sf building.  Includes relocation of existing 20″ water main, bioretention features, working along existing stream, rock removal, grading, site utilities, site concrete, asphalt paving and restoration.

Miller Milling/K&J Investments Rail Development Project

Project Description:  Earthwork, drainage, and erosion control for siding tracks and rail yard; placement of subballast and ballast stone; construction of two retaining walls, and restoration.  Rock removal adjacement to functioning railroad line.

Highway Motors Expansion, Winchester, VA

Project Description:  28,000 sf building expansion.  Project includes demolition of existing utilities and pavement, installation of new utilities, underground stormwater storage facility, import of 15,000 cy of fill, concrete and asphalt paving.

U S Silica – Mapleton Phase 3 Overburden Removal – Mapleton, PA

Project Description:  Removal of 316,000 cy of overburden within quarry. 

White Wave Facility Expansion, Mt. Crawford, VA

Project Description:  143,000 sf building expansion.  Project is phased to maintain operation of existing facility.  Consists of 190,000 cy excavation,  approximately 10,000 lf of utility work (storm, sanitary and water), concrete and asphalt paving, and concrete retaining wall.