Carmeuse Lime & Stone, Overburden Stripping 2017 – Winchester, VA

 Project Description:  Removal of 90,000 cy of overburden in the quarry and hauling to stockpile area.

Zaxby’s- Winchester, VA

 Project Description:  Sitework for fast food casual restaurant consisting of building demolition, grading including importing fill from offsite, rock removal, storm sewer, sanitary sewer, water, concrete paving and asphalt paving.

SOUTHEASTERN FREIGHTLINES – MT. CRAWFORD, VA

Project Description:  Sitework for new building pad surrounded by asphalt and concrete truck parking area.  Our contract consists of the grading including reworking ex. fill that was dumped onsite, rock removal, storm sewer, bioretention dry swale, sanitary sewer, water, concrete paving and asphalt paving. 

SHENANDOAH COUNTY HORSE TRACK EXPANSION – WOODSTOCK, VA

Project Description:  Sitework for constructing stone dust horse racing track includes grading of 35,000 cy to achieve new grades. 

Snowden Bridge Boulevard Extension – Stephenson, VA

Project Description:  Construction of approximately 1 mile of paved road with a bridge that is 126 feet in length.  The bridge crosses CSX railroad line.  Includes coordination of major utilities (ie overhead power lines, jack/bore water line under railroad).   Grading of approximately 75,000 cy including rock removal and sinkhole remediation.  Utility work consists of 3,300 […]

PLEASANT VALLEY ROAD – COMMERCIAL PROJECT – WINCHESTER, VA

Project Description:  Sitework for small commercial property.  Consists of grading, storm sewer, sanitary, water, site concrete and asphalt paving.

Graystone South – Trex 2 – Winchester, VA

Project Description:  Sitework for 407,000 sf building including relocation of approximately 46,000 cy of existing material, cut/fill of 60,000 cy, underground utilities, bioretention systems, site concrete and paving.  Aggressive construction schedule.  Job is adjacent to First Energy overhead power lines.

WMC – WEST CAMPUS RT 37 INTERCHANGE IMPROVEMENTS – Winchester, VA

Project Description:  Sitework for improvements to Rt. 37 interchange.  On Rt 522 we are adding another turn lane; Southbound ramp has a total reconstruction including roundabout and access to WMC property on west side of Rt. 37; Northbound ramp is being adjusted to meet the improvements to Southbound and give additional options once on ramp.  […]

JMU Mason Street Parking Deck

Project Description:  Sitework for 1,000 car parking garage for James Madison University use.  Work includes demolition of existing parking lot, complex foundation work – excavation, rock removal, lean concrete, backfilling of precast wall once in place, exterior utilities, site concrete and asphalt paving.  Work to be done in confined area surrounded by existing streets and […]

Graystone-Trex- Winchester, VA

Project Description:  Sitework for 350,000 sf building including removal of 40,000 cy of existing fill, cut/fill of 80,000 cy, underground utilities, bioretention systems, permeable pavers, site concrete and paving.  Project to be completed by November, 2015.  Very aggressive construction schedule.