Public Sector Projects

Navy Federal Parking Garage – Winchester, VA

 Project Description:  Sitework for parking garage.  Project consists of hauling over 100,000 cy of excess material offsite, underground utilities, Rain Tanks for underground storage, bioretention systems, site concrete and asphalt paving. 

Warren County Criminal Justice Academy – Front Royal, VA

 Project Description:  Sitework for academy and firing range buildings.  Project consists of grading, underground utilities, bioretention systems, site concrete and asphalt paving.

Shenandoah University Athletics & Events Center – Winchester, VA

Project Description:  Sitework for 80,000 sf athletic building including undercut and backfill of existing fill area within building pad, grading, rock removal, underground utilities, bioretention basins, site concrete and paving. Start Date:  September, 2016    Scheduled Completion:  Summer, 2017 Contract Amount:  between $2,000,000 and $2,500,000 Engineer:   Greenway Engineering Percentage Completed:  50% Reference: Howard Shockey and Sons, Inc. 1057 Martinsburg Pike Winchester, VA  22603 Phone: […]

SACRED HEART GYM ADDITION – WINCHESTER, VA

Project Description:  Sitework for gym addition – involves relocating existing roadway, grading in small area onsite to achieve new building pad, and relocation of utilities. 

Department of Public Works Facility – Strasburg, VA

Project Description:  Sitework for maintenance buildings and yard.  Work includes grading, storm, sanitary, water, site concrete, and placement of stone for paving.   Existing site is very rock  – removed by blasting and hoe ramming.

Shenandoah University Aspirational Village – Winchester, VA

Project Description:  Sitework for 2 ea buildings for student housing with associated parking.  Work includes grading, storm, sanitary, water, dry utilities, sidewalk, and paving. 

JMU Mason Street Parking Deck

Project Description:  Sitework for 1,000 car parking garage for James Madison University use.  Work includes demolition of existing parking lot, complex foundation work – excavation, rock removal, lean concrete, backfilling of precast wall once in place, exterior utilities, site concrete and asphalt paving.  Work to be done in confined area surrounded by existing streets and […]

Valley Health – SMH ED/MOB Expansion – Woodstock, VA

Project Description:  Sitework for 17,500 sf building expansion adjacent to existing facility including removal of rock, by hoeramming, to a uniform depth of 3′ below building subgrade to aid in footing and utility installation.  Also includes underground utilities, site concrete and paving.   Start Date:  April, 2015    Scheduled Completion:  September, 2016 Contract Amount:  between $500,000 and $1,000,000 Engineer:   Valley […]