FRAZIER QUARRY OVERBURDEN REMOVAL – HARRISONBURG, VA

Project Description:  Drill, blast, and remove 72,000 cy of overburden at quarry.

FED EX EXPANSION – WINCHESTER, VA

Project Description:  Sitework for 48,000 sf building addition including importing structural fill for new building pad, working around operating facitility, relocation of existing utilities, rock removal, and site paving.  

JOHN KERR ELEMENTARY SCHOOL – WINCHESTER, VA

Project Description:  Sitework for new elementary school in very rocky terrain.   Consists of grading, site utilities, bioretention basins, site concrete, and stone placement for asphalt paving. 

FREDERICK COUNTY MIDDLE SCHOOL – GAINESBORO, VA

Project Description:  Sitework for new middle school, adjacent to existing elementary school.   Consists of grading, site utilities, bioretention basins, site concrete, and asphalt paving. 

THE VILLAGE AT ORCHARD RIDGE PHASE 2 – WINCHESTER, VA

Project Description:  Sitework for several buildings and connector road.  Consists of grading, rock free building pads, backfill basement with geofoam blocks, site utilities, site concrete, and asphalt paving. Very rocky site requiring removal while working near ex. buildings and ex. utilities .

Nov-Dec 2014 Safety Suggestion Breakfast

On Jan. 22, 2015 Perry Engineering held a breakfast at Perkin’s Restaurant for the winners of the Nov-Dec 2014 Monthly Safety Suggestion program.  The breakfast had been postponed due to vacations, holidays and weather.  Mike Perry spoke about the importance of safety as it relates to employees, families, and the Company as a whole.  Thirty-one […]

Westminster Cantebury Addition, Winchester, VA

Project Description:  The project consists of several building additions to the existing facility.  We will encounter utility relocations, some in very tight spaces.  We will install a sanitary line in the courtyard which will mean going under the second level pedestrian crosswalk.  Considerable rock removal will be involved which will need to be hoe rammed.  […]

NFCU PARKING LOT ADDITION

Project Description:  Construction of 327 car parking lot including site lighting and landscaping.  Work consists of drilling and blasting of rock, excavating and stockpiling onsite of excess material, storm sewer, 4 bioretention ponds, site concrete and asphalting paving.  Total area of project is 6.5 acres.

WINCHESTER MARKETPLACE – PHASE 1 SITEWORK

Project Description:  Construction of a commercial site.  Includes import of 20,000 cy of structural fill for site grading.  Work consists of storm sewer, sanitary sewer including relocation and removal of existing 12″ and 15″ lines, and water line installation.  Several Filterra structures will be used for water quality.  Site concrete and paving will complete the […]

Frederick Co. Landfill Leachate Lagoon & Drainage Improvements – Winchester, VA

Project Description:  Roadway construction and widening throughout landfill, reconstruction of the leachate lagoon, construction of a leachate pumping system, and construction of stormwater and landfill cap drainage improvements.