THE VILLAGE AT ORCHARD RIDGE PHASE 2 – WINCHESTER, VA

Project Description:  Sitework for several buildings and connector road.  Consists of grading, rock free building pads, backfill basement with geofoam blocks, site utilities, site concrete, and asphalt paving. Very rocky site requiring removal while working near ex. buildings and ex. utilities .

Nov-Dec 2014 Safety Suggestion Breakfast

On Jan. 22, 2015 Perry Engineering held a breakfast at Perkin’s Restaurant for the winners of the Nov-Dec 2014 Monthly Safety Suggestion program.  The breakfast had been postponed due to vacations, holidays and weather.  Mike Perry spoke about the importance of safety as it relates to employees, families, and the Company as a whole.  Thirty-one […]

Westminster Cantebury Addition, Winchester, VA

Project Description:  The project consists of several building additions to the existing facility.  We will encounter utility relocations, some in very tight spaces.  We will install a sanitary line in the courtyard which will mean going under the second level pedestrian crosswalk.  Considerable rock removal will be involved which will need to be hoe rammed.  […]

NFCU PARKING LOT ADDITION

Project Description:  Construction of 327 car parking lot including site lighting and landscaping.  Work consists of drilling and blasting of rock, excavating and stockpiling onsite of excess material, storm sewer, 4 bioretention ponds, site concrete and asphalting paving.  Total area of project is 6.5 acres.

WINCHESTER MARKETPLACE – PHASE 1 SITEWORK

Project Description:  Construction of a commercial site.  Includes import of 20,000 cy of structural fill for site grading.  Work consists of storm sewer, sanitary sewer including relocation and removal of existing 12″ and 15″ lines, and water line installation.  Several Filterra structures will be used for water quality.  Site concrete and paving will complete the […]

Frederick Co. Landfill Leachate Lagoon & Drainage Improvements – Winchester, VA

Project Description:  Roadway construction and widening throughout landfill, reconstruction of the leachate lagoon, construction of a leachate pumping system, and construction of stormwater and landfill cap drainage improvements.

Millwood Avenue Improvements – Phase 1 – Winchester, VA

Project Description:  Construction of a right-turn lane on ex. road, reconfiguration of an intersection, modification to several business entrances, installation of new traffic signal at reconfigured intersection, installation of new stormwater infrastructure including a BMP facility and site restoration.  This work will be performed  on a major road thru Winchester so traffic control will be […]

H P HOOD WAREHOUSE – WINCHESTER, VA

Project Description:  Sitework for 260,000 sf building.  Includes relocation of existing 20″ water main, bioretention features, working along existing stream, rock removal, grading, site utilities, site concrete, asphalt paving and restoration.

THE VILLAGE AT ORCHARD RIDGE PHASE 1B – WINCHESTER, VA

Project Description:  Sitework for cottages and roadway.  Consists of grading, rock free pads, utilities, site concrete, and paving.  .

Miller Milling/K&J Investments Rail Development Project

Project Description:  Earthwork, drainage, and erosion control for siding tracks and rail yard; placement of subballast and ballast stone; construction of two retaining walls, and restoration.  Rock removal adjacement to functioning railroad line.